76.9 F
Winter Haven
Sunday, December 14, 2025
- Advertisement -

Utility Extensions on Buckeye Loop Road To Cause Lane Closures Now Through Spring 2026

- Advertisement -

Must Read

Work has begun on Buckeye Loop Road to install a new 12-inch water line, improving system reliability and overall water quality for residents and businesses in the area. The project will also help loop the existing system, creating a more efficient flow of water. Construction is anticipated to be completed by Spring 2026, with periodic lane closures and traffic control in place as needed.

To follow along and receive project updates or notifications, visit:
https://ow.ly/JSEV50XjJ8j

- Advertisement -

Latest News

SUV Driver Critically Injured After Colliding With Winter Haven Fire Engine

At approximately 10:24 p.m. on December 13, 2025, Winter Haven Fire Department Engine 4 was involved in a motor...
- Advertisement -

More Articles Like This

- Advertisement -