74.8 F
Winter Haven
Saturday, April 25, 2026
- Advertisement -

Ongoing Road Maintenance: Crack Sealing and Micro-Surfacing

- Advertisement -

Must Read

City of Winter Haven-

Ongoing Road Maintenance: Crack Sealing and Micro-Surfacing

Residents may notice a “striped” appearance on some roadways throughout Winter Haven. This is part of a scheduled maintenance process designed to extend the life of our streets and improve long-term driving conditions.

The current phase—crack sealing—fills in surface cracks to prevent water intrusion, which can lead to potholes and more costly repairs. While the appearance during this stage is temporary, it plays a critical role in protecting roadway infrastructure.

After at least 30 days of curing, a double micro-surface treatment will be applied to create a smooth, finished driving surface.

Roads will remain open to traffic throughout this process. Please use caution near work areas and follow any posted signage.

To learn more about this project and see visual examples of the treatment process, visit: https://ow.ly/iKjv50WsCYv

- Advertisement -

Latest News

Winter Haven Woman with Four Felony Warrants Found Hiding Under Blanket, Arrested by PCSO K9 Unit

On Tuesday, April 21st at around 8:30 pm, 36-year-old Holley Heart of Winter Haven was arrested by the Polk...
- Advertisement -

More Articles Like This

- Advertisement -